Glen Ellyn Public Library, Glen Ellyn Il

Project Highlights and Results

  • Engineering design to address critical needs (Priority 1) and to preserve existing equipment (Priority 2), included:
    • Installation of new direct digital control (DDC) system
    • Modifications to existing air handling systems (including equipment refurbishment)
    • The addition of reheat coils to reduce infiltration
    • Computer Room supplemental cooling
    • Conversion of existing hot water pumps to variable
  • Replacement of AHU condensing units, coils and piping.