Project Highlights and Results

  • 11 healthcare buildings; 4 educational buildings (LUC), including new construction of Translational Research Education Building.
  • Separated chilled water production and distribution for educational buildings.
  • Improved operation and efficiency of pumping, distribution and controls.
  • Separated normal/emergency power distribution/metering for educational buildings.

NEW CHILLED WATER PLANT

  • Achieved $177,200 in utility incentive funding and installed cost of approximately $850/ton by reusing existing infrastructure.
  • Avoided >$1MM in construction cost for new translational research building.

ELECTRICAL SEPARATION

  • Maintained campus aesthetics through unique working approach with utility (e.g., outdoor metal clad switchgear [non-typical to utility and purchased by University] and pad mounted transformers).

ENERGY CONSERVATION MEASURES (3 BUILDINGS)

  • Energy Project Summary
    • $1,869,000 Installation Cost
    • $694,053 Incentives Awarded
    • $506,831 Total Estimated Annual Energy Cost Savings
    • 2.32 Years – Simple Payback Term

Click here to view the full project profile