Trinity
Advocate Trinity Hospital Medical Office Building, Chicago IL

Project Highlights and Results

  • Energy Audit identified three ECMs with a combined annual utility cost savings of $96,000
    • Convert dual duct air handling system to variable volume
    • Retrofit existing lighting with new efficient fixtures
    • Replace existing electric boilers with new gas-fired high efficiency condensing boilers
to top button